Tag: Site Preparation 7

Tag: Site Preparation

Site preparation is the process of getting a construction site ready for building or development. It involves several critical tasks such as clearing the land of vegetation, trees, rocks, or debris, grading the terrain to create a level surface, and ensuring proper drainage. Site preparation can also include tasks like excavation, soil testing, and compacting the ground to ensure it can support structures. Key equipment used in site preparation includes bulldozers for clearing and grading the land, excavators for digging and removing soil or rocks, and compactors to ensure the soil is stable and ready for construction. Additionally, skid steer loaders and backhoe loaders are commonly used for moving materials and fine-tuning the grading. These machines are essential for creating a solid foundation and preventing future issues like erosion or instability.

Tag: Site Preparation 8

309 CR VAB (Long Undercarriage)
Mini Excavators

Net Power
69.5 HP
Operating Weight
21,477 lb
Dig Depth
150.2 in
Tag: Site Preparation 10

309 CR VAB (Long Undercarriage)
Mini Excavators

Net Power
69.5 hp
Operating Weight
21,477 lb
Dig Depth
150.2 in
Tag: Site Preparation 12

310 - Tier 4 / Stage V
Mini Excavators

Net Power
69.5 hp
Operating Weight
23,002 lb
Dig Depth
205.2 in
Tag: Site Preparation 19

313 GC - Tier 4 / Stage V
Small Excavators

Net Power - ISO 9249
73 hp
Operating Weight
30,400 lb
Maximum Digging Depth
19.8 ft
Tag: Site Preparation 24

313
Small Excavators

Net Power - ISO 9249
108 hp
Operating Weight
30,400 lb
Maximum Digging Depth
19.8 ft
Tag: Site Preparation 30

315 GC
Small Excavators

Net Power - ISO 9249
98 hp
Operating Weight
34,000 lb
Maximum Digging Depth
19.6 ft
Tag: Site Preparation 31

317 GC
Small Excavators

Net Power - ISO 9249
119 hp
Operating Weight
38,000 lb
Maximum Digging Depth
21 ft
Tag: Site Preparation 38

317
Small Excavators

Net Power - ISO 9249
133 hp
Operating Weight
40,200 lb
Maximum Digging Depth
21 ft
Tag: Site Preparation 44

320 GC - Tier 4 / Stage V
Medium Excavators

Net Power - ISO 9249
146 hp
Operating Weight
48,500 lb
Maximum Digging Depth
22 ft
Tag: Site Preparation 50

320 - Tier 4 / Stage V
Medium Excavators

Net Power - ISO 9249
172 hp
Operating Weight
49,800 lb
Maximum Digging Depth
22 ft
Tag: Site Preparation 56

323 - Tier 4 / Stage V
Medium Excavators

Net Power - ISO 9249
172 hp
Operating Weight
55,100 lb
Maximum Digging Depth
22.1 ft
Tag: Site Preparation 62

325 - Tier 4 / Stage V
Medium Excavators

Net Power - ISO 9249
172 hp
Operating Weight
62,800 lb
Maximum Digging Depth
22 ft
Tag: Site Preparation 69

326 - Tier 4 / Stage V
Medium Excavators

Net Power - ISO 9249
201 hp
Operating Weight
56,400 lb
Maximum Digging Depth
22.4 ft
Tag: Site Preparation 72

330 - Tier 4 / Stage V
Medium Excavators

Net Power - ISO 9249
273 hp
Operating Weight
69,200 lb
Maximum Digging Depth
23.9 ft
Tag: Site Preparation 77

330 GC - Tier 4 / Stage V
Medium Excavators

Net Power - ISO 9249
201 hp
Operating Weight
68,100 lb
Maximum Digging Depth
23.8 ft
Tag: Site Preparation 82

335 - Tier 4 / Stage V
Medium Excavators

Net Power - ISO 9249
273 hp
Operating Weight
77,000 lb
Maximum Digging Depth
22.9 ft
Tag: Site Preparation 88

340 Long Reach
Long Reach Excavation

Net Power - ISO 9249
346 hp
Operating Weight
96,500 lb
Maximum Digging Depth
42.8 ft
Tag: Site Preparation 93

349
Large Excavators

Net Power - ISO 9249
424 hp
Operating Weight
105,200 lb
Maximum Digging Depth
25.1 ft
Tag: Site Preparation 94

352 Long Reach
Long Reach Excavation

Net Power - ISO 9249
424 hp
Operating Weight
128,800 lb
Maximum Digging Depth
42.8 ft
Tag: Site Preparation 95

415
Backhoe Loaders

Net Power - SAE J1349:2011
70 hp
Dig Depth - Standard
14 ft
Operating Weight - Maximum
24,251 lb
Tag: Site Preparation 96

415 IL
Backhoe Loaders

Net Power - SAE J1349:2011
69 hp
Operating Weight - Maximum
17,637 lb
Engine Model
Cat C3.6